RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2408026490 - Archived data from Tue, 11. August 2020 17:21:38 CEST


This is all the information about APD 2408026490. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2408026490
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2416027214/2408026490
Unit: #847 (barcode 1309009305)
Preamp: 4358
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 11
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7677139 V     T = -25 °C: 347.2138092 V
Voltage for Gain 150: T = +20 °C: 390.6094027 V     T = -25 °C: 354.6432767 V
Voltage for Gain 200: T = +20 °C: 394.9689083 V     T = -25 °C: 358.8008203 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.387054707 V-1     T = -25 °C: 4.846392349 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.553857339 V-1     T = -25 °C: 8.941322435 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89213332 V-1     T = -25 °C: 15.89257395 V-1
Break-through voltage: T = +20 °C: 410.2390372 V     T = -25 °C: 374.0701041 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:13 CET jreher Updated box and position via API.
03. Feb 2021 18:15:21 CET jreher Updated box and position via API.
11. Aug 2020 17:21:38 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:39 CET jreher Updated box and position via API.
27. Nov 2019 19:31:22 CET jreher Updated APD location via API.
25. Nov 2019 17:11:47 CET jreher Updated box and position via API.
15. Jul 2019 15:50:12 CEST jreher Assigned to unit by script
15. Jul 2019 15:28:37 CEST jreher Assigned to capsule by script
04. Jul 2019 11:07:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:16 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:10 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:57 CET Tobias Corrected dark current unit.
13. Dec 2018 12:15:13 CET markus.moritz
30. Nov 2018 13:26:00 CET markus.moritz
12. Jan 2018 13:16:54 CET Tobias Imported from Hamamatsu datasheet.