RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2407026445 - Archived data from Fri, 05. February 2021 10:49:10 CET


This is all the information about APD 2407026445. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2407026445
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.3 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 353
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.7922001 V     T = -25 °C: 350.9623218 V
Voltage for Gain 150: T = +20 °C: 394.7153549 V     T = -25 °C: 358.4918989 V
Voltage for Gain 200: T = +20 °C: 399.1062312 V     T = -25 °C: 362.7100812 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.647843319 V-1     T = -25 °C: 4.729780412 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.551670574 V-1     T = -25 °C: 8.866545353 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.75761597 V-1     T = -25 °C: 15.6382264 V-1
Break-through voltage: T = +20 °C: 412.2485034 V     T = -25 °C: 376.7037963 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:47:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:10 CET jreher Updated box and position via API.
03. Feb 2021 18:15:18 CET jreher Updated box and position via API.
11. Aug 2020 17:21:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:20 CET jreher Updated APD location via API.
25. Nov 2019 17:11:45 CET jreher Updated box and position via API.
04. Jul 2019 11:07:41 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:13 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:50 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:56 CET Tobias Corrected dark current unit.
13. Dec 2018 13:24:43 CET markus.moritz
30. Nov 2018 13:41:41 CET markus.moritz
12. Jan 2018 13:16:53 CET Tobias Imported from Hamamatsu datasheet.