RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026382 - Archived data from Tue, 11. August 2020 17:20:05 CEST


This is all the information about APD 2406026382. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026382
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 394.3 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 2
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.8350015 V     T = -25 °C: 358.340756 V
Voltage for Gain 150: T = +20 °C: 402.638695 V     T = -25 °C: 365.9374708 V
Voltage for Gain 200: T = +20 °C: 406.9423766 V     T = -25 °C: 370.1887847 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.701311497 V-1     T = -25 °C: 4.671453229 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.562836184 V-1     T = -25 °C: 9.391323707 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.0202598 V-1     T = -25 °C: 14.73266592 V-1
Break-through voltage: T = +20 °C: 421.4069499 V     T = -25 °C: 385.4169319 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:49 CET jreher Updated box and position via API.
03. Feb 2021 18:14:08 CET jreher Updated box and position via API.
11. Aug 2020 17:20:05 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:29:41 CET jreher Updated APD location via API.
25. Nov 2019 17:11:00 CET jreher Updated box and position via API.
03. Jul 2019 20:03:57 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:32 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:55 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:54 CET Tobias Corrected dark current unit.
21. Aug 2018 09:35:11 CEST markus.moritz
12. Jan 2018 13:16:52 CET Tobias Imported from Hamamatsu datasheet.