RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026343 - Archived data from Tue, 11. August 2020 17:21:26 CEST


This is all the information about APD 2406026343. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026343
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 392.2 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 10
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.4824031 V     T = -25 °C: 356.2114408 V
Voltage for Gain 150: T = +20 °C: 400.29448 V     T = -25 °C: 363.7660711 V
Voltage for Gain 200: T = +20 °C: 404.6257921 V     T = -25 °C: 367.9748648 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.477046026 V-1     T = -25 °C: 4.761721176 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.870585949 V-1     T = -25 °C: 9.645955785 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.67392492 V-1     T = -25 °C: 15.27878023 V-1
Break-through voltage: T = +20 °C: 419.5673871 V     T = -25 °C: 383.3724633 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:43 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:05 CET jreher Updated box and position via API.
03. Feb 2021 18:15:13 CET jreher Updated box and position via API.
11. Aug 2020 17:21:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:10 CET jreher Updated APD location via API.
25. Nov 2019 17:11:42 CET jreher Updated box and position via API.
04. Jul 2019 11:06:11 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:10 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:43 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:53 CET Tobias Corrected dark current unit.
13. Dec 2018 13:33:18 CET markus.moritz
23. Nov 2018 13:56:22 CET markus.moritz
12. Jan 2018 13:16:52 CET Tobias Imported from Hamamatsu datasheet.