RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026330 - Archived data from Tue, 11. August 2020 17:21:23 CEST


This is all the information about APD 2406026330. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026330
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 10
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7641649 V     T = -25 °C: 348.2163736 V
Voltage for Gain 150: T = +20 °C: 391.6855359 V     T = -25 °C: 355.7574982 V
Voltage for Gain 200: T = +20 °C: 396.1364585 V     T = -25 °C: 359.9529334 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.794500482 V-1     T = -25 °C: 4.824055914 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.174530994 V-1     T = -25 °C: 9.740426634 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.32711645 V-1     T = -25 °C: 14.57635945 V-1
Break-through voltage: T = +20 °C: 411.6522568 V     T = -25 °C: 375.5095868 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:43:46 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:06 CEST oafedulidis Updated box and position via API.
03. May 2021 10:26:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:03 CET jreher Updated box and position via API.
03. Feb 2021 18:15:11 CET jreher Updated box and position via API.
11. Aug 2020 17:21:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:09 CET jreher Updated APD location via API.
25. Nov 2019 17:11:41 CET jreher Updated box and position via API.
04. Jul 2019 11:06:10 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:36 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:53 CET Tobias Corrected dark current unit.
13. Dec 2018 13:41:25 CET markus.moritz
23. Nov 2018 13:59:19 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.