RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2406026323 - Archived data from Fri, 05. February 2021 10:49:03 CET


This is all the information about APD 2406026323. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2406026323
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 10
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8704911 V     T = -25 °C: 350.1868661 V
Voltage for Gain 150: T = +20 °C: 393.727325 V     T = -25 °C: 357.6568167 V
Voltage for Gain 200: T = +20 °C: 398.1386866 V     T = -25 °C: 361.8812648 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.602026534 V-1     T = -25 °C: 4.767226135 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.845574129 V-1     T = -25 °C: 9.306929753 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.76367991 V-1     T = -25 °C: 14.2635609 V-1
Break-through voltage: T = +20 °C: 411.865329 V     T = -25 °C: 377.3764806 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:38:44 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:55 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:01:06 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:52 CEST oafedulidis Updated box and position via API.
03. May 2021 10:26:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:03 CET jreher Updated box and position via API.
03. Feb 2021 18:15:10 CET jreher Updated box and position via API.
11. Aug 2020 17:21:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:09 CET jreher Updated APD location via API.
25. Nov 2019 17:11:40 CET jreher Updated box and position via API.
04. Jul 2019 11:06:10 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:52 CET Tobias Corrected dark current unit.
13. Dec 2018 13:43:31 CET markus.moritz
23. Nov 2018 14:00:39 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.