RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026318 - Archived data from Wed, 03. February 2021 18:15:10 CET


This is all the information about APD 2405026318. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026318
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026318/2415027134
Unit: #856 (barcode 1309009398)
Preamp: 4354
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 10
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8642881 V     T = -25 °C: 346.4048475 V
Voltage for Gain 150: T = +20 °C: 389.7564 V     T = -25 °C: 353.8402239 V
Voltage for Gain 200: T = +20 °C: 394.1323109 V     T = -25 °C: 357.971189 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.633819104 V-1     T = -25 °C: 4.906448287 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.176564989 V-1     T = -25 °C: 9.283608304 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48360093 V-1     T = -25 °C: 14.79328295 V-1
Break-through voltage: T = +20 °C: 409.9238582 V     T = -25 °C: 373.370209 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:02 CET jreher Updated box and position via API.
03. Feb 2021 18:15:10 CET jreher Updated box and position via API.
11. Aug 2020 17:21:21 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:51 CET jreher Updated box and position via API.
27. Nov 2019 19:31:09 CET jreher Updated APD location via API.
25. Nov 2019 17:11:40 CET jreher Updated box and position via API.
17. Oct 2019 14:04:41 CEST tholtmann Assigned to unit by script
17. Oct 2019 13:45:11 CEST tholtmann Assigned to capsule by script
04. Jul 2019 11:06:09 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:08 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:35 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:52 CET Tobias Corrected dark current unit.
13. Dec 2018 13:45:11 CET markus.moritz
23. Nov 2018 14:01:36 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.