RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026299 - Archived data from Wed, 03. February 2021 18:15:06 CET


This is all the information about APD 2405026299. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026299
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.3 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 9
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5321169 V     T = -25 °C: 348.8620976 V
Voltage for Gain 150: T = +20 °C: 392.3223951 V     T = -25 °C: 356.2665156 V
Voltage for Gain 200: T = +20 °C: 396.6537518 V     T = -25 °C: 360.4216788 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.486641913 V-1     T = -25 °C: 4.981931684 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.834116206 V-1     T = -25 °C: 9.301232977 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55482097 V-1     T = -25 °C: 14.68553927 V-1
Break-through voltage: T = +20 °C: 412.0714302 V     T = -25 °C: 375.6102962 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:58:59 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:02:10 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:58 CET jreher Updated box and position via API.
03. Feb 2021 18:15:06 CET jreher Updated box and position via API.
11. Aug 2020 17:21:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:31:00 CET jreher Updated APD location via API.
25. Nov 2019 17:11:38 CET jreher Updated box and position via API.
04. Jul 2019 11:06:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:27 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:52 CET Tobias Corrected dark current unit.
13. Dec 2018 14:05:33 CET markus.moritz
23. Nov 2018 11:57:12 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.