RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026291 - Archived data from Wed, 03. February 2021 18:15:05 CET


This is all the information about APD 2405026291. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026291
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2320025871/2405026291
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 9
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4644243 V     T = -25 °C: 345.1780288 V
Voltage for Gain 150: T = +20 °C: 388.2636379 V     T = -25 °C: 352.5530871 V
Voltage for Gain 200: T = +20 °C: 392.6122952 V     T = -25 °C: 356.6733608 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.489746327 V-1     T = -25 °C: 4.894415827 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.826827572 V-1     T = -25 °C: 9.012786352 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.43460782 V-1     T = -25 °C: 16.11114813 V-1
Break-through voltage: T = +20 °C: 408.2695617 V     T = -25 °C: 371.8941264 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:57 CET jreher Updated box and position via API.
03. Feb 2021 18:15:05 CET jreher Updated box and position via API.
11. Aug 2020 17:21:16 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:30 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:10 CET jreher Updated box and position via API.
27. Nov 2019 19:30:59 CET jreher Updated APD location via API.
25. Nov 2019 17:11:37 CET jreher Updated box and position via API.
04. Jul 2019 11:06:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:00 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:51 CET Tobias Corrected dark current unit.
13. Dec 2018 14:03:25 CET markus.moritz
23. Nov 2018 11:59:22 CET markus.moritz
12. Jan 2018 13:16:51 CET Tobias Imported from Hamamatsu datasheet.