RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2405026277 - Archived data from Wed, 03. February 2021 18:15:03 CET


This is all the information about APD 2405026277. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2405026277
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 386.3 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 9
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.323515 V     T = -25 °C: 350.5871205 V
Voltage for Gain 150: T = +20 °C: 394.1555901 V     T = -25 °C: 358.0618261 V
Voltage for Gain 200: T = +20 °C: 398.5151929 V     T = -25 °C: 362.2595387 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523420314 V-1     T = -25 °C: 4.664386732 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.928045968 V-1     T = -25 °C: 9.371115171 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.7105235 V-1     T = -25 °C: 14.72565367 V-1
Break-through voltage: T = +20 °C: 413.9480292 V     T = -25 °C: 377.7882861 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:56 CET jreher Updated box and position via API.
03. Feb 2021 18:15:03 CET jreher Updated box and position via API.
11. Aug 2020 17:21:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:58 CET jreher Updated APD location via API.
25. Nov 2019 17:11:36 CET jreher Updated box and position via API.
04. Jul 2019 11:06:02 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:02:25 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:51 CET Tobias Corrected dark current unit.
13. Dec 2018 13:59:24 CET markus.moritz
23. Nov 2018 12:02:42 CET markus.moritz
12. Jan 2018 13:16:50 CET Tobias Imported from Hamamatsu datasheet.