RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026213 - Archived data from Tue, 11. August 2020 17:21:04 CEST


This is all the information about APD 2404026213. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026213
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.6 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.0473661 V     T = -25 °C: 353.16187 V
Voltage for Gain 150: T = +20 °C: 396.9823926 V     T = -25 °C: 360.720554 V
Voltage for Gain 200: T = +20 °C: 401.3964525 V     T = -25 °C: 364.9374398 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.55708265 V-1     T = -25 °C: 4.789718628 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.960699171 V-1     T = -25 °C: 9.64785018 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88806401 V-1     T = -25 °C: 15.23174956 V-1
Break-through voltage: T = +20 °C: 416.2654808 V     T = -25 °C: 379.8026642 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:45 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:46 CET jreher Updated box and position via API.
03. Feb 2021 18:14:56 CET jreher Updated box and position via API.
11. Aug 2020 17:21:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:48 CET jreher Updated APD location via API.
25. Nov 2019 17:11:32 CET jreher Updated box and position via API.
04. Jul 2019 11:05:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:00 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:54 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:49 CET Tobias Corrected dark current unit.
26. Nov 2018 12:05:08 CET markus.moritz
16. Nov 2018 11:49:48 CET markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.