RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026163 - Archived data from Fri, 05. February 2021 10:48:35 CET


This is all the information about APD 2404026163. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026163
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 255
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.6233133 V     T = -25 °C: 353.6770664 V
Voltage for Gain 150: T = +20 °C: 397.6357113 V     T = -25 °C: 361.2772671 V
Voltage for Gain 200: T = +20 °C: 402.0826967 V     T = -25 °C: 365.5216104 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.340814006 V-1     T = -25 °C: 5.024299748 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.502982709 V-1     T = -25 °C: 8.766040572 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.67808819 V-1     T = -25 °C: 15.2900017 V-1
Break-through voltage: T = +20 °C: 417.3233923 V     T = -25 °C: 381.0608215 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:49:32 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:32 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:21:17 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:35 CET jreher Updated box and position via API.
03. Feb 2021 18:14:48 CET jreher Updated box and position via API.
11. Aug 2020 17:20:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:37 CET jreher Updated APD location via API.
25. Nov 2019 17:11:27 CET jreher Updated box and position via API.
04. Jul 2019 11:05:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:57 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:19 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:48 CET Tobias Corrected dark current unit.
02. Oct 2018 13:43:21 CEST markus.moritz
26. Sep 2018 12:00:50 CEST markus.moritz
12. Jan 2018 13:16:49 CET Tobias Imported from Hamamatsu datasheet.