RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026154 - Archived data from Wed, 03. February 2021 18:14:47 CET


This is all the information about APD 2404026154. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026154
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 7
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3839612 V     T = -25 °C: 349.9897666 V
Voltage for Gain 150: T = +20 °C: 393.3608353 V     T = -25 °C: 357.5153968 V
Voltage for Gain 200: T = +20 °C: 397.8020226 V     T = -25 °C: 361.7386475 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429009426 V-1     T = -25 °C: 4.841271752 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.515366191 V-1     T = -25 °C: 8.869444727 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.69068411 V-1     T = -25 °C: 15.47716718 V-1
Break-through voltage: T = +20 °C: 412.7042842 V     T = -25 °C: 377.0535114 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 14:20:32 CEST jreher Assigned to capsule by script
16. Feb 2021 12:28:33 CET jreher Updated box and position via API.
05. Feb 2021 10:48:32 CET jreher Updated box and position via API.
03. Feb 2021 18:14:47 CET jreher Updated box and position via API.
11. Aug 2020 17:20:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:37 CET jreher Updated APD location via API.
25. Nov 2019 17:11:27 CET jreher Updated box and position via API.
04. Jul 2019 11:05:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:12 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:48 CET Tobias Corrected dark current unit.
02. Oct 2018 13:49:44 CEST markus.moritz
26. Sep 2018 11:56:47 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.