Show Hamamatsu Avalanche Photo Diode 2403026124 - Archived data from Thu, 13. February 2020 14:23:22 CET
					This is all the information about APD 2403026124. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2403026124 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | Bochum | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | C07 | 
| Break-through voltage: | 410 V | 
| Voltage for Gain 100 (T=+25°C): | 381.2 V | 
| Dark current: | 7.7 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 7 | 
| Position in Box: | 8 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | none | 
| Position in grid: | none | 
| Arrival for irradiation: | 21. Sep 2018 | 
| Sent for analysis after irradiation: | 02. Oct 2018 | 
| Return for assembly: | none | 
| Irradiation: | |
| Date: | 27. Sep 2018 | 
| Dose used: | none | 
| Temperature: | none | 
| Position: | none | 
| Bias voltage: | none | 
| Annealing: | |
| Date: | 28. Sep 2018 | 
| Temperature: | 80 °C | 
| Duration: | 48 h | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none | 
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none | 
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none | 
| Break-through voltage: | T = +20 °C: none T = -25 °C: none | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 05. Feb 2021 10:48:28 CET | jreher | Updated box and position via API. | 
| 03. Feb 2021 18:14:46 CET | jreher | Updated box and position via API. | 
| 03. Sep 2020 14:34:22 CEST | jreher | Assigned to unit by script | 
| 11. Aug 2020 17:20:50 CEST | jreher | Updated APD characteristics via API. | 
| 03. Apr 2020 09:45:26 CEST | jreher | Assigned to capsule by script | 
| 13. Feb 2020 14:23:22 CET | jreher | Updated box and position via API. | 
| 27. Nov 2019 19:30:35 CET | jreher | Updated APD location via API. | 
| 25. Nov 2019 17:11:25 CET | jreher | Updated box and position via API. | 
| 04. Jul 2019 11:05:44 CEST | jreher | Updated APD location via API. | 
| 12. Jun 2019 16:45:54 CEST | jreher | Updated APD batch assignment via API. | 
| 12. Jun 2019 16:30:49 CEST | jreher | Updated APD batch assignment via API. | 
| 12. Jun 2019 15:01:10 CEST | jreher | Updated APD batch assignment via API. | 
| 03. Jan 2019 00:12:47 CET | Tobias | Corrected dark current unit. | 
| 02. Oct 2018 14:49:38 CEST | markus.moritz | |
| 26. Sep 2018 11:39:40 CEST | markus.moritz | |
| 12. Jan 2018 13:16:48 CET | Tobias | Imported from Hamamatsu datasheet. | 
 
						 
					