Subdetector specification:  
Serial: 2403026109
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026109/2406026332
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 1
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6024739 V     T = -25 °C: 348.8773578 V
Voltage for Gain 150: T = +20 °C: 392.4836296 V     T = -25 °C: 356.320849 V
Voltage for Gain 200: T = +20 °C: 396.8149558 V     T = -25 °C: 360.559681 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.594562193 V-1     T = -25 °C: 4.531376718 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.391425705 V-1     T = -25 °C: 9.611716531 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.54305884 V-1     T = -25 °C: 15.31408783 V-1
Break-through voltage: T = +20 °C: 411.9720522 V     T = -25 °C: 376.1997132 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:36 CET jreher Updated box and position via API.
03. Feb 2021 18:14:04 CET jreher Updated box and position via API.
29. Jan 2021 10:23:33 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:45 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:28:41 CET jreher Updated APD location via API.
25. Nov 2019 17:10:57 CET jreher Updated box and position via API.
25. Nov 2019 16:56:05 CET jreher Updated box and position via API.
03. Jul 2019 20:03:17 CEST jreher Updated APD location via API.
13. Jun 2019 11:23:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:45:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:55:15 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:47 CET Tobias Corrected dark current unit.
21. Aug 2018 09:09:41 CEST markus.moritz
20. Aug 2018 14:50:35 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.