RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402026034 - Archived data from Wed, 03. February 2021 18:14:18 CET


This is all the information about APD 2402026034. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402026034
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.2 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 3
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.0869857 V     T = -25 °C: 342.5235518 V
Voltage for Gain 150: T = +20 °C: 384.8954802 V     T = -25 °C: 349.8365534 V
Voltage for Gain 200: T = +20 °C: 389.2345221 V     T = -25 °C: 353.9235283 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.670122738 V-1     T = -25 °C: 4.850531255 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.285410416 V-1     T = -25 °C: 9.99073548 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59795871 V-1     T = -25 °C: 16.13712095 V-1
Break-through voltage: T = +20 °C: 404.1555787 V     T = -25 °C: 369.4136097 V
   
Notes: foam


Version history

Time Author Change comment
17. Jun 2021 19:18:55 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:20 CET jreher Updated box and position via API.
05. Feb 2021 10:47:58 CET jreher Updated box and position via API.
03. Feb 2021 18:14:18 CET jreher Updated box and position via API.
11. Aug 2020 17:20:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:29:54 CET jreher Updated APD location via API.
25. Nov 2019 17:11:08 CET jreher Updated box and position via API.
04. Jul 2019 11:04:30 CEST jreher Updated APD location via API.
04. Jul 2019 11:04:20 CEST jreher Updated APD location via API.
04. Jul 2019 11:03:00 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:26 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:15 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:58:55 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:45 CET Tobias Corrected dark current unit.
21. Aug 2018 08:59:20 CEST markus.moritz
20. Aug 2018 13:43:41 CEST markus.moritz
12. Jan 2018 13:16:47 CET Tobias Imported from Hamamatsu datasheet.