RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402026009 - Archived data from Tue, 11. August 2020 17:20:13 CEST


This is all the information about APD 2402026009. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402026009
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 386.1 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 3
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6364401 V     T = -25 °C: 349.7935981 V
Voltage for Gain 150: T = +20 °C: 393.4054102 V     T = -25 °C: 357.3265844 V
Voltage for Gain 200: T = +20 °C: 397.7599674 V     T = -25 °C: 361.529963 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.046964352 V-1     T = -25 °C: 4.992368247 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.825880886 V-1     T = -25 °C: 9.184531306 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.51460153 V-1     T = -25 °C: 16.611898 V-1
Break-through voltage: T = +20 °C: 412.4046774 V     T = -25 °C: 376.7293654 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:47:55 CET jreher Updated box and position via API.
03. Feb 2021 18:14:15 CET jreher Updated box and position via API.
03. Sep 2020 14:25:37 CEST jreher Assigned to capsule by script
11. Aug 2020 17:20:13 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:31 CET jreher Updated box and position via API.
27. Nov 2019 19:29:52 CET jreher Updated APD location via API.
25. Nov 2019 17:11:06 CET jreher Updated box and position via API.
04. Jul 2019 11:04:28 CEST jreher Updated APD location via API.
04. Jul 2019 11:04:18 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:58 CEST jreher Updated APD location via API.
04. Jul 2019 11:02:24 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:13 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:31 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:11 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:58:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:56:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:44 CET Tobias Corrected dark current unit.
21. Aug 2018 08:50:23 CEST markus.moritz
20. Aug 2018 13:29:04 CEST markus.moritz
12. Jan 2018 13:16:46 CET Tobias Imported from Hamamatsu datasheet.