RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402025990 - Archived data from Wed, 03. February 2021 18:14:41 CET


This is all the information about APD 2402025990. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402025990
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 6
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1014744 V     T = -25 °C: 347.5955499 V
Voltage for Gain 150: T = +20 °C: 391.0223659 V     T = -25 °C: 355.0764073 V
Voltage for Gain 200: T = +20 °C: 395.4296913 V     T = -25 °C: 359.2649962 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660428733 V-1     T = -25 °C: 4.912601082 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.078169123 V-1     T = -25 °C: 8.981501323 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96603864 V-1     T = -25 °C: 15.84420236 V-1
Break-through voltage: T = +20 °C: 411.4194635 V     T = -25 °C: 374.9673394 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:23 CET jreher Updated box and position via API.
03. Feb 2021 18:14:41 CET jreher Updated box and position via API.
11. Aug 2020 17:20:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:27 CET jreher Updated APD location via API.
25. Nov 2019 17:11:24 CET jreher Updated box and position via API.
04. Jul 2019 11:05:39 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:03 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:43 CET Tobias Corrected dark current unit.
02. Oct 2018 15:38:13 CEST markus.moritz
26. Sep 2018 12:30:33 CEST markus.moritz
12. Jan 2018 13:16:46 CET Tobias Imported from Hamamatsu datasheet.