RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025948 - Archived data from Wed, 03. February 2021 18:14:38 CET


This is all the information about APD 2401025948. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025948
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025948/2501027579
Unit: #1454 (barcode 1309016051)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 6
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6018699 V     T = -25 °C: 347.0913888 V
Voltage for Gain 150: T = +20 °C: 390.4280673 V     T = -25 °C: 354.5259739 V
Voltage for Gain 200: T = +20 °C: 394.7786654 V     T = -25 °C: 358.691811 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.428995619 V-1     T = -25 °C: 4.862055059 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.639041113 V-1     T = -25 °C: 9.014995912 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.04098462 V-1     T = -25 °C: 15.85619509 V-1
Break-through voltage: T = +20 °C: 410.5968384 V     T = -25 °C: 374.3552967 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:20 CET jreher Updated box and position via API.
03. Feb 2021 18:14:38 CET jreher Updated box and position via API.
07. Oct 2020 12:19:09 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:07 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:42 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:25 CET jreher Updated APD location via API.
25. Nov 2019 17:11:21 CET jreher Updated box and position via API.
04. Jul 2019 11:05:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:55 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:42 CET Tobias Corrected dark current unit.
02. Oct 2018 15:05:08 CEST markus.moritz
26. Sep 2018 12:14:37 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.