RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025930 - Archived data from Tue, 11. August 2020 17:20:38 CEST


This is all the information about APD 2401025930. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025930
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.5444608 V     T = -25 °C: 350.7073058 V
Voltage for Gain 150: T = +20 °C: 394.4124735 V     T = -25 °C: 358.2260494 V
Voltage for Gain 200: T = +20 °C: 398.7873457 V     T = -25 °C: 362.4615486 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.469653055 V-1     T = -25 °C: 4.580589291 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.754786918 V-1     T = -25 °C: 9.164141635 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21361416 V-1     T = -25 °C: 14.4290467 V-1
Break-through voltage: T = +20 °C: 414.0133504 V     T = -25 °C: 378.0964767 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:49:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:16 CET jreher Updated box and position via API.
03. Feb 2021 18:14:35 CET jreher Updated box and position via API.
11. Aug 2020 17:20:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:16 CET jreher Updated APD location via API.
25. Nov 2019 17:11:19 CET jreher Updated box and position via API.
04. Jul 2019 11:05:31 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:34 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:53 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:41 CET Tobias Corrected dark current unit.
26. Sep 2018 12:57:28 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.