RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025925 - Archived data from Tue, 11. August 2020 17:20:37 CEST


This is all the information about APD 2401025925. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025925
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.1 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 5
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1532006 V     T = -25 °C: 350.4140958 V
Voltage for Gain 150: T = +20 °C: 394.036895 V     T = -25 °C: 357.9287118 V
Voltage for Gain 200: T = +20 °C: 398.4178466 V     T = -25 °C: 362.1407986 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.542419576 V-1     T = -25 °C: 4.710973563 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.025015093 V-1     T = -25 °C: 9.448024726 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.03289106 V-1     T = -25 °C: 14.95692542 V-1
Break-through voltage: T = +20 °C: 412.3089865 V     T = -25 °C: 377.1720479 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:15 CET jreher Updated box and position via API.
03. Feb 2021 18:14:34 CET jreher Updated box and position via API.
08. Dec 2020 17:07:06 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:01 CEST vwerner Updated box and position via API.
11. Aug 2020 17:20:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:16 CET jreher Updated APD location via API.
25. Nov 2019 17:11:19 CET jreher Updated box and position via API.
04. Jul 2019 11:05:31 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:33 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:53 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:41 CET Tobias Corrected dark current unit.
26. Sep 2018 12:59:25 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.