RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025872 - Archived data from Wed, 03. February 2021 18:14:30 CET


This is all the information about APD 2320025872. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025872
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2320025872/2317025604
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 5
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.295664 V     T = -25 °C: 344.1742936 V
Voltage for Gain 150: T = +20 °C: 387.1042627 V     T = -25 °C: 351.5427984 V
Voltage for Gain 200: T = +20 °C: 391.4832846 V     T = -25 °C: 355.6770534 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584765676 V-1     T = -25 °C: 4.901620369 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.980892505 V-1     T = -25 °C: 9.083255941 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.86430524 V-1     T = -25 °C: 16.13784196 V-1
Break-through voltage: T = +20 °C: 407.3876117 V     T = -25 °C: 371.10117 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:09 CET jreher Updated box and position via API.
03. Feb 2021 18:14:30 CET jreher Updated box and position via API.
11. Aug 2020 17:20:30 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:17 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:30 CET jreher Updated box and position via API.
13. Feb 2020 14:22:18 CET jreher Updated box and position via API.
27. Nov 2019 19:30:13 CET jreher Updated APD location via API.
25. Nov 2019 17:11:16 CET jreher Updated box and position via API.
04. Jul 2019 11:05:28 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:02 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 12:38:03 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.