RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025859 - Archived data from Tue, 08. December 2020 17:17:57 CET


This is all the information about APD 2320025859. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025859
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2517028892/2320025859
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.347601 V     T = -25 °C: 349.7425283 V
Voltage for Gain 150: T = +20 °C: 393.1718327 V     T = -25 °C: 357.1697139 V
Voltage for Gain 200: T = +20 °C: 397.5297735 V     T = -25 °C: 361.342575 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.520352013 V-1     T = -25 °C: 4.64747742 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.928742894 V-1     T = -25 °C: 9.34672147 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.74063573 V-1     T = -25 °C: 14.75457893 V-1
Break-through voltage: T = +20 °C: 412.4461895 V     T = -25 °C: 376.1002338 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:06 CET jreher Updated box and position via API.
03. Feb 2021 18:14:26 CET jreher Updated box and position via API.
08. Dec 2020 17:17:57 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:07 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:27 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:05 CET jreher Updated APD location via API.
25. Nov 2019 17:11:14 CET jreher Updated box and position via API.
04. Jul 2019 11:05:23 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:39 CET Tobias Corrected dark current unit.
26. Sep 2018 11:26:21 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.