RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025822 - Archived data from Tue, 11. August 2020 17:20:21 CEST


This is all the information about APD 2320025822. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025822
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026119/2320025822
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9831045 V     T = -25 °C: 345.1942733 V
Voltage for Gain 150: T = +20 °C: 388.8061475 V     T = -25 °C: 352.6035845 V
Voltage for Gain 200: T = +20 °C: 393.2187944 V     T = -25 °C: 356.7524618 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.569119986 V-1     T = -25 °C: 4.983757274 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.067642103 V-1     T = -25 °C: 9.429004217 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.37468523 V-1     T = -25 °C: 15.38487553 V-1
Break-through voltage: T = +20 °C: 408.400256 V     T = -25 °C: 372.0017624 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:02 CET jreher Updated box and position via API.
03. Feb 2021 18:14:22 CET jreher Updated box and position via API.
11. Aug 2020 17:20:21 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:40 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:27 CET jreher Updated box and position via API.
27. Nov 2019 19:30:02 CET jreher Updated APD location via API.
25. Nov 2019 17:11:11 CET jreher Updated box and position via API.
04. Jul 2019 11:05:20 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:59:13 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:38 CET Tobias Corrected dark current unit.
02. Oct 2018 15:49:23 CEST markus.moritz
26. Sep 2018 10:58:56 CEST markus.moritz
12. Jan 2018 13:16:43 CET Tobias Imported from Hamamatsu datasheet.