RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025818 - Archived data from Wed, 07. October 2020 12:11:07 CEST


This is all the information about APD 2320025818. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025818
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2505027928/2320025818
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6646129 V     T = -25 °C: 345.9493118 V
Voltage for Gain 150: T = +20 °C: 389.4545706 V     T = -25 °C: 353.346201 V
Voltage for Gain 200: T = +20 °C: 393.8136281 V     T = -25 °C: 357.4995239 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.401880447 V-1     T = -25 °C: 4.991951982 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.826569826 V-1     T = -25 °C: 9.182134852 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83060635 V-1     T = -25 °C: 16.00026443 V-1
Break-through voltage: T = +20 °C: 409.3822624 V     T = -25 °C: 372.9483299 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:02 CET jreher Updated box and position via API.
03. Feb 2021 18:14:22 CET jreher Updated box and position via API.
07. Oct 2020 12:11:07 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:02 CET jreher Updated APD location via API.
25. Nov 2019 17:11:11 CET jreher Updated box and position via API.
04. Jul 2019 11:05:19 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:59:13 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:38 CET Tobias Corrected dark current unit.
02. Oct 2018 15:55:55 CEST markus.moritz
26. Sep 2018 11:01:31 CEST markus.moritz
12. Jan 2018 13:16:43 CET Tobias Imported from Hamamatsu datasheet.