RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519029026 - Archived data from Fri, 05. February 2021 10:57:01 CET


This is all the information about APD 2519029026. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519029026
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 67
Position in Box: 44
EP1 batch: 47
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6027346 V     T = -25 °C: 345.3345037 V
Voltage for Gain 150: T = +20 °C: 388.5059124 V     T = -25 °C: 352.7415862 V
Voltage for Gain 200: T = +20 °C: 392.910732 V     T = -25 °C: 356.922767 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.394659769 V-1     T = -25 °C: 4.774078059 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.427234782 V-1     T = -25 °C: 9.587885935 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.38357332 V-1     T = -25 °C: 15.14249084 V-1
Break-through voltage: T = +20 °C: 408.2841264 V     T = -25 °C: 372.1789554 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:08:07 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 10:57:01 CET jreher Updated box and position via API.
03. Feb 2021 18:22:34 CET jreher Updated box and position via API.
18. Dec 2020 14:00:52 CET jreher Updated box and position via API.
11. Aug 2020 17:33:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:40 CET jreher Updated APD location via API.
25. Nov 2019 17:16:14 CET jreher Updated box and position via API.
05. Aug 2019 16:54:49 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 13:41:39 CEST markus.moritz
05. Jul 2019 13:45:14 CEST jreher Updated APD location via API.
01. Jul 2019 12:45:59 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:38 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:16 CET Tobias Imported from Hamamatsu datasheet.