Show Hamamatsu Avalanche Photo Diode 2519029022 - Archived data from Wed, 03. February 2021 18:22:34 CET
This is all the information about APD 2519029022. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2519029022 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | E03 |
| Break-through voltage: | 405 V |
| Voltage for Gain 100 (T=+25°C): | 377.5 V |
| Dark current: | 4.5 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 67 |
| Position in Box: | 40 |
| EP1 batch: | 47 |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 16. Jul 2019 |
| Sent for analysis after irradiation: | 19. Jul 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 16. Jul 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 17. Jul 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 377.5100412 V T = -25 °C: 342.4494542 V |
| Voltage for Gain 150: | T = +20 °C: 385.292156 V T = -25 °C: 349.7707116 V |
| Voltage for Gain 200: | T = +20 °C: 389.6462446 V T = -25 °C: 353.875638 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.515269954 V-1 T = -25 °C: 4.84956259 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.891787522 V-1 T = -25 °C: 9.939890756 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.56085844 V-1 T = -25 °C: 15.93038216 V-1 |
| Break-through voltage: | T = +20 °C: 404.3911527 V T = -25 °C: 368.5671715 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 16. Nov 2022 10:53:51 CET | oafedulidis | Assigned to capsule by script |
| 09. Dec 2021 13:11:13 CET | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 10:57:01 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:22:34 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:33:36 CEST | jreher | Updated APD characteristics via API. |
| 27. Nov 2019 19:40:39 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:16:13 CET | jreher | Updated box and position via API. |
| 05. Aug 2019 16:54:48 CEST | jreher | Updated APD batch assignment via API. |
| 29. Jul 2019 13:30:29 CEST | markus.moritz | |
| 05. Jul 2019 13:45:13 CEST | jreher | Updated APD location via API. |
| 01. Jul 2019 12:45:59 CEST | jgrochowski | Updated APD batch assignment via API. |
| 03. Jan 2019 00:12:38 CET | Tobias | Corrected dark current unit. |
| 12. Jan 2018 13:12:16 CET | Tobias | Imported from Hamamatsu datasheet. |