RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519028990 - Archived data from Wed, 03. February 2021 18:22:30 CET


This is all the information about APD 2519028990. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519028990
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.7 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 67
Position in Box: 9
EP1 batch: 46
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.5792783 V     T = -25 °C: 339.7248005 V
Voltage for Gain 150: T = +20 °C: 382.3496834 V     T = -25 °C: 347.005484 V
Voltage for Gain 200: T = +20 °C: 386.700991 V     T = -25 °C: 351.1095936 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.481481707 V-1     T = -25 °C: 5.095228272 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.708693736 V-1     T = -25 °C: 9.554941763 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03789236 V-1     T = -25 °C: 15.15543499 V-1
Break-through voltage: T = +20 °C: 402.6454845 V     T = -25 °C: 366.3392101 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:57 CET jreher Updated box and position via API.
03. Feb 2021 18:22:30 CET jreher Updated box and position via API.
11. Aug 2020 17:33:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:37 CET jreher Updated APD location via API.
25. Nov 2019 17:16:11 CET jreher Updated box and position via API.
05. Aug 2019 16:54:40 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:58:55 CEST markus.moritz
05. Jul 2019 13:45:11 CEST jreher Updated APD location via API.
01. Jul 2019 12:50:03 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:37 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.