RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028951 - Archived data from Mon, 05. August 2019 16:50:15 CEST


This is all the information about APD 2518028951. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028951
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 66
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 66
Position in Box: 23
EP1 batch: 45
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:22:57 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:15 CEST jreher Updated box and position via API.
05. Feb 2021 10:56:50 CET jreher Updated box and position via API.
03. Feb 2021 18:22:24 CET jreher Updated box and position via API.
11. Aug 2020 17:33:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:27 CET jreher Updated APD location via API.
25. Nov 2019 17:16:07 CET jreher Updated box and position via API.
05. Aug 2019 16:50:15 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:04 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 12:30:45 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:30:30 CEST markus.moritz
05. Jul 2019 13:45:04 CEST jreher Updated APD location via API.
01. Jul 2019 12:55:58 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:36 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.