RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028948 - Archived data from Wed, 03. February 2021 18:22:24 CET


This is all the information about APD 2518028948. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028948
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2518028948/2520029119
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 11.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 66
Position in Box: 20
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1934196 V     T = -25 °C: 344.0860253 V
Voltage for Gain 150: T = +20 °C: 387.0381785 V     T = -25 °C: 351.4597387 V
Voltage for Gain 200: T = +20 °C: 391.4062856 V     T = -25 °C: 355.607004 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.547919793 V-1     T = -25 °C: 4.897677228 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.88936224 V-1     T = -25 °C: 9.055164073 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.49964043 V-1     T = -25 °C: 15.86809115 V-1
Break-through voltage: T = +20 °C: 406.0074918 V     T = -25 °C: 370.9595186 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:50 CET jreher Updated box and position via API.
03. Feb 2021 18:22:24 CET jreher Updated box and position via API.
11. Aug 2020 17:33:23 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:52:41 CEST jreher Assigned to capsule by script
13. Feb 2020 14:21:52 CET jreher Updated box and position via API.
27. Nov 2019 19:40:27 CET jreher Updated APD location via API.
25. Nov 2019 17:16:07 CET jreher Updated box and position via API.
05. Aug 2019 16:50:15 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:04 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:28:37 CEST markus.moritz
05. Jul 2019 13:45:04 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:35 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.