RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028928 - Archived data from Mon, 29. July 2019 10:43:41 CEST


This is all the information about APD 2518028928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028928
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 65
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 65
Position in Box: 50
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:32:19 CET oafedulidis Assigned to capsule by script
27. Aug 2021 11:15:56 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:45 CET jreher Updated box and position via API.
03. Feb 2021 18:22:20 CET jreher Updated box and position via API.
11. Aug 2020 17:33:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:18 CET jreher Updated APD location via API.
25. Nov 2019 17:16:04 CET jreher Updated box and position via API.
05. Aug 2019 16:50:13 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:02 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 10:43:41 CEST markus.moritz
05. Jul 2019 13:44:58 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:49 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:35 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.