RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028890 - Archived data from Wed, 03. February 2021 18:22:16 CET


This is all the information about APD 2517028890. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028890
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 65
Position in Box: 21
EP1 batch: 43
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.1813079 V     T = -25 °C: 342.177823 V
Voltage for Gain 150: T = +20 °C: 384.9895226 V     T = -25 °C: 349.5287206 V
Voltage for Gain 200: T = +20 °C: 389.3718484 V     T = -25 °C: 353.6416872 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.570950129 V-1     T = -25 °C: 4.88107652 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.002279849 V-1     T = -25 °C: 9.066709831 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.8859688 V-1     T = -25 °C: 16.09309328 V-1
Break-through voltage: T = +20 °C: 404.7792213 V     T = -25 °C: 368.7911054 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:42 CET jreher Updated box and position via API.
03. Feb 2021 18:22:16 CET jreher Updated box and position via API.
11. Aug 2020 17:33:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:16 CET jreher Updated APD location via API.
25. Nov 2019 17:16:02 CET jreher Updated box and position via API.
05. Aug 2019 16:49:38 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 15:20:03 CEST markus.moritz
05. Jul 2019 13:44:56 CEST jreher Updated APD location via API.
01. Jul 2019 13:08:19 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:34 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.