RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028870 - Archived data from Tue, 11. August 2020 17:33:10 CEST


This is all the information about APD 2517028870. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028870
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 65
Position in Box: 2
EP1 batch: 42
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 16. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.1331151 V     T = -25 °C: 342.0377711 V
Voltage for Gain 150: T = +20 °C: 384.9644914 V     T = -25 °C: 349.3903248 V
Voltage for Gain 200: T = +20 °C: 389.3511533 V     T = -25 °C: 353.5084102 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.626366272 V-1     T = -25 °C: 4.937648716 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.946774995 V-1     T = -25 °C: 9.141393924 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.60022525 V-1     T = -25 °C: 16.29957213 V-1
Break-through voltage: T = +20 °C: 405.016603 V     T = -25 °C: 368.7115444 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:10:01 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:39 CEST jreher Updated box and position via API.
05. Feb 2021 10:56:40 CET jreher Updated box and position via API.
03. Feb 2021 18:22:14 CET jreher Updated box and position via API.
11. Aug 2020 17:33:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:14 CET jreher Updated APD location via API.
25. Nov 2019 17:16:00 CET jreher Updated box and position via API.
05. Aug 2019 16:48:25 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 12:23:45 CEST markus.moritz
05. Jul 2019 13:44:54 CEST jreher Updated APD location via API.
01. Jul 2019 14:31:12 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:33 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.