RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028866 - Archived data from Tue, 11. August 2020 17:33:09 CEST


This is all the information about APD 2517028866. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028866
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.7 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 64
Position in Box: 29
EP1 batch: 42
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.8518232 V     T = -25 °C: 340.9367258 V
Voltage for Gain 150: T = +20 °C: 383.6216046 V     T = -25 °C: 348.1941848 V
Voltage for Gain 200: T = +20 °C: 387.9582049 V     T = -25 °C: 352.2688103 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.721030813 V-1     T = -25 °C: 5.019457928 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.354135824 V-1     T = -25 °C: 9.443213755 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.61064611 V-1     T = -25 °C: 15.01142896 V-1
Break-through voltage: T = +20 °C: 403.7455619 V     T = -25 °C: 367.3542181 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:06 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:37 CET jreher Updated box and position via API.
03. Feb 2021 18:22:11 CET jreher Updated box and position via API.
11. Aug 2020 17:33:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:07 CET jreher Updated APD location via API.
25. Nov 2019 17:15:59 CET jreher Updated box and position via API.
05. Aug 2019 16:48:25 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 12:22:23 CEST markus.moritz
05. Jul 2019 13:44:50 CEST jreher Updated APD location via API.
01. Jul 2019 14:31:11 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:33 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.