RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028839 - Archived data from Tue, 11. August 2020 17:33:04 CEST


This is all the information about APD 2517028839. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028839
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 64
Position in Box: 21
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 16. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5809982 V     T = -25 °C: 347.8095407 V
Voltage for Gain 150: T = +20 °C: 391.4249234 V     T = -25 °C: 355.2717841 V
Voltage for Gain 200: T = +20 °C: 395.7729458 V     T = -25 °C: 359.4623929 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.437107825 V-1     T = -25 °C: 4.969066712 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.650186163 V-1     T = -25 °C: 9.168810547 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10338382 V-1     T = -25 °C: 16.33625922 V-1
Break-through voltage: T = +20 °C: 410.3863595 V     T = -25 °C: 373.9462615 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:35 CET jreher Updated box and position via API.
03. Feb 2021 18:22:08 CET jreher Updated box and position via API.
08. Dec 2020 17:07:04 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:01 CEST vwerner Updated box and position via API.
11. Aug 2020 17:33:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:04 CET jreher Updated APD location via API.
25. Nov 2019 17:15:57 CET jreher Updated box and position via API.
01. Aug 2019 12:11:15 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 12:07:41 CEST markus.moritz
05. Jul 2019 13:44:48 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:52 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:32 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.