RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028811 - Archived data from Tue, 11. August 2020 17:33:00 CEST


This is all the information about APD 2516028811. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028811
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.7 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 63
Position in Box: 48
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7306441 V     T = -25 °C: 341.6421445 V
Voltage for Gain 150: T = +20 °C: 384.5089656 V     T = -25 °C: 348.9967312 V
Voltage for Gain 200: T = +20 °C: 388.871046 V     T = -25 °C: 353.1351365 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.756903676 V-1     T = -25 °C: 4.734103343 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.588843933 V-1     T = -25 °C: 9.471549042 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67021411 V-1     T = -25 °C: 15.08531427 V-1
Break-through voltage: T = +20 °C: 404.7454218 V     T = -25 °C: 368.7477529 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:30 CET jreher Updated box and position via API.
03. Feb 2021 18:22:03 CET jreher Updated box and position via API.
11. Aug 2020 17:33:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:55 CET jreher Updated APD location via API.
25. Nov 2019 17:15:55 CET jreher Updated box and position via API.
01. Aug 2019 12:11:31 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 11:51:38 CEST markus.moritz
05. Jul 2019 13:44:42 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:51 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:31 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.