RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0724007181 - Archived data from Tue, 11. August 2020 17:34:07 CEST


This is all the information about APD 0724007181. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0724007181
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 12.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 187
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1615039 V     T = -25 °C: 347.3639442 V
Voltage for Gain 150: T = +20 °C: 390.9658018 V     T = -25 °C: 354.6858982 V
Voltage for Gain 200: T = +20 °C: 395.2898561 V     T = -25 °C: 358.7842655 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523883406 V-1     T = -25 °C: 4.835627464 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.901363993 V-1     T = -25 °C: 9.725034916 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.56384327 V-1     T = -25 °C: 15.45903976 V-1
Break-through voltage: T = +20 °C: 410.5051163 V     T = -25 °C: 373.9072502 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:52:15 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:51 CET jreher Updated box and position via API.
05. Feb 2021 11:12:30 CET jreher Updated box and position via API.
11. Aug 2020 17:34:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:02:08 CET jreher Updated APD location via API.
25. Nov 2019 17:25:39 CET jreher Updated box and position via API.
13. Aug 2019 12:17:04 CEST jreher Updated APD location via API.
05. Aug 2019 17:05:34 CEST jreher Updated APD batch assignment via API.
10. Jul 2019 11:10:43 CEST markus.moritz
22. Jun 2016 15:22:31 CEST Tobias Imported from Hamamatsu datasheet.