RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028726 - Archived data from Wed, 16. June 2021 16:04:10 CEST


This is all the information about APD 2515028726. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028726
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 34
EP1 batch: 39
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.5545214 V     T = -25 °C: 352.6107707 V
Voltage for Gain 150: T = +20 °C: 396.4197436 V     T = -25 °C: 360.1233646 V
Voltage for Gain 200: T = +20 °C: 400.7700717 V     T = -25 °C: 364.3310972 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.403016481 V-1     T = -25 °C: 4.623097015 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.624797376 V-1     T = -25 °C: 9.228170363 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03320733 V-1     T = -25 °C: 14.51975102 V-1
Break-through voltage: T = +20 °C: 415.2360773 V     T = -25 °C: 378.9967144 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:15:12 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:10 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:23 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:03 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:21 CET jreher Updated box and position via API.
03. Feb 2021 18:21:54 CET jreher Updated box and position via API.
11. Aug 2020 17:32:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:43 CET jreher Updated APD location via API.
25. Nov 2019 17:15:47 CET jreher Updated box and position via API.
01. Aug 2019 12:12:02 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 14:10:05 CEST markus.moritz
05. Jul 2019 13:44:32 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:03 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.