RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028679 - Archived data from Wed, 03. February 2021 18:21:48 CET


This is all the information about APD 2515028679. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028679
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2515028679/0812008147
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 61
Position in Box: 43
EP1 batch: 37
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.117526 V     T = -25 °C: 343.7002444 V
Voltage for Gain 150: T = +20 °C: 386.9015398 V     T = -25 °C: 351.011865 V
Voltage for Gain 200: T = +20 °C: 391.2323912 V     T = -25 °C: 355.1105577 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.646356493 V-1     T = -25 °C: 4.755381546 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.278441774 V-1     T = -25 °C: 9.712717182 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59802836 V-1     T = -25 °C: 15.72334053 V-1
Break-through voltage: T = +20 °C: 406.4143551 V     T = -25 °C: 370.0954653 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:14 CET jreher Updated box and position via API.
03. Feb 2021 18:21:48 CET jreher Updated box and position via API.
07. Oct 2020 12:28:08 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:40 CEST jreher Updated box and position via API.
11. Aug 2020 17:32:40 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:33 CET jreher Updated APD location via API.
25. Nov 2019 17:15:43 CET jreher Updated box and position via API.
01. Aug 2019 12:12:48 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:35:47 CEST markus.moritz
12. Jul 2019 13:55:40 CEST jreher Updated APD location via API.
01. Jul 2019 14:26:56 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:28 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.