RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028626 - Archived data from Wed, 03. February 2021 18:21:43 CET


This is all the information about APD 2514028626. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028626
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 3
EP1 batch: 36
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8074472 V     T = -25 °C: 345.450487 V
Voltage for Gain 150: T = +20 °C: 388.613143 V     T = -25 °C: 352.8230592 V
Voltage for Gain 200: T = +20 °C: 392.9504923 V     T = -25 °C: 356.9494182 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.448088149 V-1     T = -25 °C: 4.96786565 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.662946828 V-1     T = -25 °C: 8.978407931 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.73924678 V-1     T = -25 °C: 16.48766729 V-1
Break-through voltage: T = +20 °C: 408.3694726 V     T = -25 °C: 372.2083147 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:07:58 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 10:56:09 CET jreher Updated box and position via API.
03. Feb 2021 18:21:43 CET jreher Updated box and position via API.
18. Dec 2020 14:00:51 CET jreher Updated box and position via API.
11. Aug 2020 17:32:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:30 CET jreher Updated APD location via API.
25. Nov 2019 17:15:40 CET jreher Updated box and position via API.
01. Aug 2019 12:13:04 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 10:02:23 CEST markus.moritz
12. Jul 2019 13:55:37 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:50 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:27 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.