RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028625 - Archived data from Wed, 03. February 2021 18:21:43 CET


This is all the information about APD 2514028625. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028625
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.6 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 2
EP1 batch: 36
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.4471365 V     T = -25 °C: 342.7908959 V
Voltage for Gain 150: T = +20 °C: 384.3349139 V     T = -25 °C: 349.90884 V
Voltage for Gain 200: T = +20 °C: 388.7582348 V     T = -25 °C: 353.8892574 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584227861 V-1     T = -25 °C: 4.99320873 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.860055131 V-1     T = -25 °C: 10.41917663 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.7914776 V-1     T = -25 °C: 17.38143113 V-1
Break-through voltage: T = +20 °C: 404.0748422 V     T = -25 °C: 368.2116031 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:38 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:09 CET jreher Updated box and position via API.
03. Feb 2021 18:21:43 CET jreher Updated box and position via API.
11. Aug 2020 17:32:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:30 CET jreher Updated APD location via API.
25. Nov 2019 17:15:40 CET jreher Updated box and position via API.
01. Aug 2019 12:13:04 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 10:02:05 CEST markus.moritz
12. Jul 2019 13:55:37 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:50 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:27 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.