RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028605 - Archived data from Fri, 05. February 2021 11:11:16 CET


This is all the information about APD 2514028605. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028605
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G03
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 21
EP1 batch: 35
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8426819 V     T = -25 °C: 347.9726582 V
Voltage for Gain 150: T = +20 °C: 391.5948232 V     T = -25 °C: 355.4857173 V
Voltage for Gain 200: T = +20 °C: 396.682949 V     T = -25 °C: 359.7058776 V
Gain/Voltage slope at M = 100: T = +20 °C: 5.233867455 V-1     T = -25 °C: 4.88128751 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.405248814 V-1     T = -25 °C: 8.95916898 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 24.59058363 V-1     T = -25 °C: 16.04790048 V-1
Break-through voltage: T = +20 °C: 411.795136 V     T = -25 °C: 375.4834604 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:48 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:16 CET jreher Updated box and position via API.
11. Aug 2020 17:32:27 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:28 CET jreher Updated APD location via API.
25. Nov 2019 17:24:55 CET jreher Updated box and position via API.
30. Jul 2019 15:20:20 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:50:50 CEST markus.moritz
05. Jul 2019 14:50:23 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:18 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:26 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.