RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028576 - Archived data from Tue, 11. August 2020 17:32:21 CEST


This is all the information about APD 2514028576. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028576
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 5
EP1 batch: 34
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.116802 V     T = -25 °C: 347.2426209 V
Voltage for Gain 150: T = +20 °C: 390.8875737 V     T = -25 °C: 354.6665229 V
Voltage for Gain 200: T = +20 °C: 395.2053217 V     T = -25 °C: 358.8318795 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.794743023 V-1     T = -25 °C: 4.8391705 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.530001507 V-1     T = -25 °C: 9.215571063 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.27441707 V-1     T = -25 °C: 14.53036852 V-1
Break-through voltage: T = +20 °C: 410.4045397 V     T = -25 °C: 374.000874 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 17:00:48 CEST jreher Updated box and position via API.
05. Feb 2021 11:11:12 CET jreher Updated box and position via API.
11. Aug 2020 17:32:21 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:26 CET jreher Updated APD location via API.
25. Nov 2019 17:24:53 CET jreher Updated box and position via API.
30. Jul 2019 15:19:59 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:41:17 CEST markus.moritz
23. Jul 2019 15:28:51 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:50:21 CEST jreher Updated APD location via API.
24. Jun 2019 16:06:49 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:25 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.