RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028551 - Archived data from Fri, 05. February 2021 11:11:41 CET


This is all the information about APD 2513028551. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028551
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 181
Position in Box: 29
EP1 batch: 34
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5140703 V     T = -25 °C: 347.8414981 V
Voltage for Gain 150: T = +20 °C: 390.3424921 V     T = -25 °C: 355.0538965 V
Voltage for Gain 200: T = +20 °C: 394.6853703 V     T = -25 °C: 359.0819846 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.620865193 V-1     T = -25 °C: 4.746674129 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.20598064 V-1     T = -25 °C: 10.17614572 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48971659 V-1     T = -25 °C: 16.52692919 V-1
Break-through voltage: T = +20 °C: 409.2643244 V     T = -25 °C: 372.8881566 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:47:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:41 CET jreher Updated box and position via API.
11. Aug 2020 17:32:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:02 CET jreher Updated APD location via API.
25. Nov 2019 17:25:10 CET jreher Updated box and position via API.
30. Jul 2019 15:19:58 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 15:28:50 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:50:48 CEST jreher Updated APD location via API.
24. Jun 2019 16:06:48 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:25 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.