RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028543 - Archived data from Fri, 05. February 2021 11:11:40 CET


This is all the information about APD 2513028543. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028543
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 181
Position in Box: 23
EP1 batch: 34
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.785561 V     T = -25 °C: 354.1918935 V
Voltage for Gain 150: T = +20 °C: 397.6648817 V     T = -25 °C: 361.6708763 V
Voltage for Gain 200: T = +20 °C: 402.0696374 V     T = -25 °C: 365.8717973 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.262250094 V-1     T = -25 °C: 4.886210362 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.499162175 V-1     T = -25 °C: 8.962646361 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78813583 V-1     T = -25 °C: 15.8871642 V-1
Break-through voltage: T = +20 °C: 416.6697416 V     T = -25 °C: 380.5036281 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:47:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:40 CET jreher Updated box and position via API.
11. Aug 2020 17:32:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:01 CET jreher Updated APD location via API.
25. Nov 2019 17:25:09 CET jreher Updated box and position via API.
30. Jul 2019 15:19:41 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:38:06 CEST markus.moritz
23. Jul 2019 15:28:49 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:50:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:12:25 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.