RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028528 - Archived data from Fri, 05. February 2021 11:11:38 CET


This is all the information about APD 2513028528. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028528
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 181
Position in Box: 10
EP1 batch: 33
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2579118 V     T = -25 °C: 343.6791515 V
Voltage for Gain 150: T = +20 °C: 387.1449638 V     T = -25 °C: 351.1655725 V
Voltage for Gain 200: T = +20 °C: 391.569097 V     T = -25 °C: 355.3907946 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.50360513 V-1     T = -25 °C: 4.62347461 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.82524435 V-1     T = -25 °C: 9.243860554 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.46338979 V-1     T = -25 °C: 14.51377753 V-1
Break-through voltage: T = +20 °C: 407.7175391 V     T = -25 °C: 371.3663558 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:47:32 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:38 CET jreher Updated box and position via API.
11. Aug 2020 17:32:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:00 CET jreher Updated APD location via API.
25. Nov 2019 17:25:08 CET jreher Updated box and position via API.
30. Jul 2019 15:19:40 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:50:46 CEST jreher Updated APD location via API.
24. Jun 2019 16:09:56 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:24 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.