RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028525 - Archived data from Tue, 11. August 2020 17:32:13 CEST


This is all the information about APD 2513028525. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028525
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2707030543/2513028525
Unit: #1250 (barcode 1309013753)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 181
Position in Box: 13
EP1 batch: 33
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6570407 V     T = -25 °C: 344.0841662 V
Voltage for Gain 150: T = +20 °C: 387.4939255 V     T = -25 °C: 351.4884562 V
Voltage for Gain 200: T = +20 °C: 391.8745542 V     T = -25 °C: 355.6499304 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.435391816 V-1     T = -25 °C: 4.936370803 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.710427859 V-1     T = -25 °C: 9.156686433 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28051126 V-1     T = -25 °C: 14.51200533 V-1
Break-through voltage: T = +20 °C: 407.428255 V     T = -25 °C: 370.9215016 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:38 CET jreher Updated box and position via API.
11. Aug 2020 17:32:13 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:14:26 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:40 CET jreher Updated box and position via API.
27. Nov 2019 20:01:00 CET jreher Updated APD location via API.
25. Nov 2019 17:25:08 CET jreher Updated box and position via API.
30. Jul 2019 15:19:40 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:50:46 CEST jreher Updated APD location via API.
24. Jun 2019 16:09:55 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:24 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.