RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028509 - Archived data from Tue, 11. August 2020 17:32:10 CEST


This is all the information about APD 2513028509. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028509
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2513028509/2420027490
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 180
Position in Box: 47
EP1 batch: 32
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1251313 V     T = -25 °C: 346.3032581 V
Voltage for Gain 150: T = +20 °C: 389.1072268 V     T = -25 °C: 353.6731006 V
Voltage for Gain 200: T = +20 °C: 393.582744 V     T = -25 °C: 357.8060095 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.545801181 V-1     T = -25 °C: 4.896060265 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.087332322 V-1     T = -25 °C: 9.082005592 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.95618745 V-1     T = -25 °C: 14.72742788 V-1
Break-through voltage: T = +20 °C: 409.3595238 V     T = -25 °C: 372.8908157 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:33 CET jreher Updated box and position via API.
11. Aug 2020 17:32:10 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:54 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:34 CET jreher Updated box and position via API.
27. Nov 2019 20:00:51 CET jreher Updated APD location via API.
25. Nov 2019 17:25:06 CET jreher Updated box and position via API.
30. Jul 2019 15:19:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:50:40 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:12 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:23 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.