RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2512028420 - Archived data from Tue, 11. August 2020 17:31:58 CEST


This is all the information about APD 2512028420. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2512028420
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 179
Position in Box: 31
EP1 batch: 30
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.967356 V     T = -25 °C: 342.9221213 V
Voltage for Gain 150: T = +20 °C: 384.8057243 V     T = -25 °C: 350.0469905 V
Voltage for Gain 200: T = +20 °C: 389.178604 V     T = -25 °C: 354.026204 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.699115447 V-1     T = -25 °C: 4.831384945 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.588887536 V-1     T = -25 °C: 10.19647799 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.08447209 V-1     T = -25 °C: 16.9404537 V-1
Break-through voltage: T = +20 °C: 405.0574022 V     T = -25 °C: 368.9052663 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:23 CET jreher Updated box and position via API.
11. Aug 2020 17:31:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:39 CET jreher Updated APD location via API.
25. Nov 2019 17:25:00 CET jreher Updated box and position via API.
30. Jul 2019 15:18:52 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:39:41 CEST markus.moritz
05. Jul 2019 14:50:31 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:05 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:21 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.