RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028345 - Archived data from Tue, 11. August 2020 17:31:47 CEST


This is all the information about APD 2511028345. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028345
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391.5 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 18
EP1 batch: 28
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.7973197 V     T = -25 °C: 356.829714 V
Voltage for Gain 150: T = +20 °C: 399.7587014 V     T = -25 °C: 364.1804094 V
Voltage for Gain 200: T = +20 °C: 404.1725845 V     T = -25 °C: 368.2945095 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.320225995 V-1     T = -25 °C: 4.68843035 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.577144668 V-1     T = -25 °C: 9.707035588 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.92441957 V-1     T = -25 °C: 15.69370794 V-1
Break-through voltage: T = +20 °C: 418.7757767 V     T = -25 °C: 382.5650988 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:31:01 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:36 CET jreher Updated box and position via API.
11. Aug 2020 17:31:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:32 CET jreher Updated APD location via API.
25. Nov 2019 17:24:31 CET jreher Updated box and position via API.
30. Jul 2019 15:18:15 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:20:07 CEST markus.moritz
05. Jul 2019 13:59:08 CEST jreher Updated APD location via API.
24. Jun 2019 16:15:11 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:19 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.